• 29 April 2019 | Prosthetic cases

    Titanium thimble crown frame with PMMA temporary crown

    Preparation of a titanium thimble crown frame on an inLink® connection, to receive individual zirconia crowns.

  • 20 February 2019 | Prosthetic cases

    Montreal structure with Angulated screw access

    Design of a Montreal structure with Angulated screw access and retention optimization for better stability of the denture teeth.

  • 30 May 2018 | Prosthetic cases

    Machined reproduction of a bridge with vestibular cut-back in multi-layer zirconia

    Discover the machined reproduction of a bridge with cut-back

  • 25 April 2018 | Prosthetic cases

    Suprastructure WrapAround with horizontal drilling and inLink® connection

    The purpose of the horizontal drilling is to promote resin adherence.

  • 25 April 2018 | Prosthetic cases

    Montreal suprastructure on inLink® connection

    Discover the realisation of a Montreal suprastructure on an inLink® connection.

  • 14 April 2018 | Prosthetic cases

    Montreal superstructure with axis adjustment

    Discover a Montreal superstructure with axis adjustment and retention for teeth in resin.

  • 19 March 2018 | Prosthetic cases

    Upper and lower CoCr implant bridge with axis adjustment

    Discover the creation of an upper and lower CoCr implant bridge with axis adjustment

  • 13 March 2018 | Prosthetic cases

    Wax up copy milling with axis adjustment

    The prosthesis wants a bridge implant, made with waxup. Discover how a wax up copy milling was made. 

  • 01 March 2018 | Prosthetic cases

    Ceramisation of a zirconia arch with inLink® connection

    The art of prosthesis according to Jean-Pierre Casu, Kosmeteeth practice. Discover the ceramisation of a zirconia arch.

  • 02 January 2018 | Prosthetic cases

    Simeda prosthesis case study : Case of CoCr Thimble Crown

    See how CoCr implant bridges are made when screw channels protrude from the vestibular area and axes cannot be adjusted.

Pages